Cost, Job and Project Centers
You will be able to: Explain what a center is and what it never changes; Set up a center and turn its field on; Tag documents so the cost and revenue of a job or project can be separated.
- Read not done yet
- Self-check: not taken not done yet
- Lesson complete not done yet
Zeyto has three separate lists of tags: Cost Centers, Job Centers and Project Centers. A tag is put on a transaction line, or on a whole document, to show where money went: a department, a customer job or a project. Zeyto treats the three the same way and one line can carry all three. A tag never changes an amount or an account. It only lets you filter and group later.
Setting up
- Open Accounting ▸ Cost Centers (Job Centers and Project Centers are beside it). They are also tabs of the same masters screen as Numbering and Fiscal Years.
- Press + New, keep the suggested Code (CC-001, JC-001 or PC-001) or type your own, and type the Name.
- Pick a Parent if this one sits under another, or leave Root level. Press Save.
- There is no Delete. Set Status to Inactive: it is hidden from new entries but kept for history, and posted entries keep their tag.
- A parent only groups the list and the picker. Reports match one center exactly and do not add up its children.
- Import CSV/XLSX loads many: headings Code, Name, Parent and Active.
Turning the field on
| Center | Starting state |
|---|---|
| Cost Center | On by default |
| Job Center | Hidden until ticked in Settings ▸ Document Entry (Dimensions) |
| Project Center | Hidden until ticked in Settings ▸ Document Entry (Dimensions) |
Turning one off hides its field on entry screens for everyone, even where the Form Designer would show it.
Where you tag
Once the field is on, it appears on sales and purchase documents, receipts and payments, expenses, advances, bank entries, journals and taxable journals. Pick the center in the header to tag every line, or in one line to tag only that line. A line's own center wins over the header's.
Try it in the demo
- Open Accounting ▸ Cost Centers in the demo and see how Job Centers and Project Centers sit beside it.
- Open Settings ▸ Document Entry and find the Dimensions box.
- Open a journal entry form and look for the Cost Center field in the header and in a line.
Public demo company, sign in as admin / demoAdmin123. Data refreshes nightly.
- Cost, Job and Project Centers are three independent tags; a line can carry all three.
- A tag never changes an amount or account.
- Job and Project fields stay hidden until ticked in Document Entry.
- A line's tag wins over the header's.
Check yourself
5 questions on this lesson. Not timed, not the exam, and you can try again. Score 60% or more, and read the lesson, to complete it.