Multi-level bill of materials
Define recipes and sub-assemblies with components, quantities, wastage allowances and units. Revise a BOM without breaking the history of what was already produced.
Zeyto runs your bill of materials, production orders, material issues and finished-goods costing on your own PC. When the internet drops on the shop floor, the line keeps moving and invoices keep printing.
Most UAE manufacturers run production on spreadsheets and their accounts on Tally or Zoho, then spend the month reconciling the two. Stock on paper never matches stock on the floor, job costs are guessed after the fact, and a dropped connection at the wrong moment stops billing. Zeyto brings raw-material purchase, bill of materials, production orders, work-in-progress, finished-goods costing, warehouse stock and double-entry accounting into one offline-first system that lives on your own hardware.
Define recipes and sub-assemblies with components, quantities, wastage allowances and units. Revise a BOM without breaking the history of what was already produced.
Raise an order for a finished item, and Zeyto explodes the BOM into the exact materials to issue. Track planned versus actual consumption on every run.
Issue raw materials from the store to a job, hold value in work-in-progress, and receive finished goods back into inventory at true cost.
Roll material and overhead into the cost of each produced unit so margins are calculated, not estimated at month-end.
Trace every batch from the raw lot it came from to the customer it shipped to. Essential for food, chemicals, pharma and any recall-sensitive line.
Keep raw-material stores, WIP and finished-goods warehouses separate, with live balances and inter-warehouse transfers.
Send materials out for a process, track what is with the subcontractor, and receive the processed goods back against the order.
Book scrap, rejects and process loss against a run so yield is visible and costed, not lost in a rounding gap.
Log supplier purchases with input VAT captured for your FTA return. Stock lands in the raw-material store at landed cost.
Pick the finished item and quantity. Zeyto explodes the bill of materials into the components and quantities required.
Move components from store to the shop floor. Value shifts into work-in-progress as materials are consumed.
Book completed units back into the finished-goods warehouse, with batch or serial numbers assigned as they come off the line.
Material, labour and overhead settle onto each unit so you know the true cost before you quote the next order.
Invoice from stock, print a branded delivery note and tax invoice, and send by WhatsApp or email โ all offline if the line has no connection.
Factories in industrial zones like Al Quoz, Ajman and Jebel Ali do not get flawless internet. With Zeyto that does not matter. Every operational function โ issuing materials, receiving finished goods, printing a delivery note, filing a VAT return โ runs on your own PC through Zeyto Edge and PostgreSQL. The licensing and cloud servers are never in the path of a transaction, so an outage is a background inconvenience, not a production halt.
| Capability | Excel + basic accounts | Generic cloud ERP | Zeyto |
|---|---|---|---|
| Bill of materials & production orders | Manual, error-prone | Add-on or missing | Built in |
| True finished-goods costing | Guessed at month-end | Partial | Per run, automatic |
| Works with no internet | Yes, but disconnected | No, cloud-dependent | Yes, by design |
| Business data location | Scattered files | Vendor's cloud | Your own PC |
| Batch & serial traceability | No | Sometimes | Built in |
| UAE VAT & 2027 e-invoicing | Manual | Varies | Compliant today, ready for 2027 |
Book a walkthrough, or start a 14-day trial on your own PC with your own data. No cloud lock-in, no data leaving your premises.