1. Which two screens make up Zeyto's recipe-based manufacturing?

2. A cake batch costs flour 7.00, sugar 4.00 and eggs 16.00 (AED) for 10 cakes. What does Zeyto value each finished cake at?

3. Which account does a production run post through to net out Inventory movements?

4. Can a BOM contain a component that is itself made from another BOM and be produced in one entry?

5. What does saving a BOM do to stock?

6. Which are refused when saving a BOM?

Select all that apply.

7. A BOM has Qty per Batch 10 and flour 2 kg. What is the flour per single unit?

8. Which permission is needed to delete a BOM?

9. BOM: 10 cakes need 2 kg flour. Qty to Produce is 30. How much flour does the run use?

10. Qty to Produce is 25 on a 10-cake BOM with 20 eggs per batch. How many eggs?

11. Components for 30 cakes cost AED 81.00 in total. What is the unit cost of the finished item?

12. Why does the Total column of a production entry read about twice the batch cost?

13. Produce saves a draft that you must submit later.

14. You recorded 40 cakes instead of 30. How do you correct the stock?

15. Which is NOT a reason a production run may be refused?

16. You hold 10 kg flour at AED 3.50 and buy 10 kg at AED 4.50. What is the average cost per kg?

17. With average cost AED 4.00 per kg, what is the flour cost of a run using 6 kg?

18. A warehouse holds 4 kg of flour, a run needs 6 kg and Negative Stock is Block. What happens?

19. With Negative Stock set to Warn or Ignore, what is true for the same run?

Select all that apply.

20. What is the effect of changing a costing setting?

21. Which centers are on by default?

22. A center tag changes the account an amount posts to.

23. A line has Cost Center A and the document header has Cost Center B. Which wins for that line?

24. How do you stop using a center that already has entries?

25. A parent center has two children. Does the General Ledger filter on the parent include the children?

26. Project PC-014 has tagged purchases of AED 8,000 and tagged sales of AED 12,000. What does a General Ledger filtered to PC-014 let you read?

27. Where do you see the stock and ledger rows of a production entry?

28. Which statement about project tracking in Zeyto ERP is true?