Manufacturing and Project Tracking: study sheet

Outcomes, the key takeaway of every lesson and the key tables, on a sheet you can print or save as a PDF.

In the print dialog choose A4 and turn off “Headers and footers”. To keep a PDF, pick “Save as PDF” as the printer. The sheet prints landscape, in columns.

Zeyto Academy · Specialist · Module 16

Manufacturing and Project Tracking

Bills of Materials, production runs and their costing, plus Cost, Job and Project Centers for following a job or project.

You will be able to

  • Create Bills of Materials and record production runs
  • Explain how a run is costed and what stock rules apply
  • Set up and use Cost, Job and Project Centers
  • Review production and tagged work in the standard reports

What manufacturing covers in Zeyto

  • Manufacturing is recipe based: BOM, then Production Entry.
  • A run moves stock and the ledger through WIP Clearing and nets to zero.
  • No labour or overhead cost is added.
  • One level deep; no draft, amend or cancel.

Bills of Materials

  • A BOM is a reusable recipe: Finished Item, Qty per Batch, components.
  • One BOM per finished item; saving replaces components.
  • Active BOMs only appear in Production Entry.
  • Use Inactive instead of losing a recipe.

Recording a production run

  • Produce posts at once: components out, finished goods in at their total cost.
  • Component qty = BOM qty × Qty to Produce ÷ Qty per Batch, to four decimals.
  • The Total column reads about twice the cost.
  • Correct mistakes with a Stock Adjustment.

Costing and stock rules that affect production

  • Components leave at average, FIFO or LIFO cost; the finished item enters at the total.
  • Block refuses a run that would go negative unless the warehouse allows negative.
  • No labour or overhead is added.
  • Fix mistakes with Stock Adjustments.

Cost, Job and Project Centers

  • Cost, Job and Project Centers are three independent tags; a line can carry all three.
  • A tag never changes an amount or account.
  • Job and Project fields stay hidden until ticked in Document Entry.
  • A line's tag wins over the header's.

Tracking production and projects

  • Use Posting Trail for the stock and ledger rows of a run.
  • Filter General Ledger to one center for its tagged cost and revenue.
  • Tags do not enforce budgets or schedules.
  • Check that every project entry was tagged before using a total.

What manufacturing covers in Zeyto: key table

ScreenPathJob
Bill of MaterialsInventory ▸ Bill of MaterialsThe recipe: which components, how much, per batch. Moves no stock
Production EntryInventory ▸ Production EntryRecords a run. Posts at once: components out, finished goods in

Bills of Materials: key table

ActionPermission
Save a BOMinventory.create
Delete a BOMinventory.amend
Produce from a BOMinventory.submit

Costing and stock rules that affect production: key table

Negative Stock settingRun that would take a component below zero
BlockRefused, and the message names the line
WarnAllowed after a warning
IgnoreAllowed

Cost, Job and Project Centers: key table

CenterStarting state
Cost CenterOn by default
Job CenterHidden until ticked in Settings ▸ Document Entry (Dimensions)
Project CenterHidden until ticked in Settings ▸ Document Entry (Dimensions)

Tracking production and projects: key table

QuestionWhere
What did this run use and make?Production Entries list ▸ View, a side panel with components used and the finished item
What moved in stock and the ledger?Reports ▸ Accounting ▸ Posting Trail, type the entry's Doc No (MFG-00001)
What did it really cost?Stock Ledger / Movement report (the register Total reads about twice the cost)
Do I have the components?Stock Balance & Valuation report for the warehouse
Scan or visit zeyto.app/academy/learn/m16-manufacturing-projects for the full lessons, self-checks and practice quiz.Online learning material from Emeron Infospace FZE. Not a professional qualification.