Procurement, subcontracts and site control: practice quiz

Instant feedback with an explanation after every answer.

Answered 0 of 24. Practice questions are not the exam.

1. After the store reserves what it holds against a material request, the shortfall goes on:

2. Which panel on a document shows the whole buying chain with links both ways?

3. A request is for 1,200 bags and the store holds 450. After Reserve, the requisition quantity is:

4. An order of 900 bags at AED 18.50 plus 5% VAT comes to:

5. Awarding a line to a supplier that is not the lowest landed price needs:

6. Supplier B quotes 17.80 a bag plus 1.10 freight. The landed rate is:

7. 600 bags awarded to C at 17.80 and 300 to A at 18.50 cost:

8. An order is 18.50 a bag and the supplier invoices 19.20 on 900 bags with a 2% invoice tolerance. What happens?

9. A goods receipt can take at most:

10. Goods on hold after inspection count as stock.

11. 880 bags are counted. 840 pass and 30 are rejected. How many must be held?

12. 900 bags invoiced at 18.50, 840 accepted. What value is booked as not accepted?

13. An issue above the BOQ quantity of an item needs:

14. BOQ 1,000 bags, 960 already issued, 60 requested. By how much is the issue above BOQ?

15. A new phone can send records as soon as its user opens the mobile app, before anyone approves it.

16. Which are true about returns, transfers and phone sync?

Select all that apply.

17. Which is the order of a subcontract certificate?

18. Item A has 2,000 m2. 1,500 m2 are certified. A new certificate claims 600 m2. What happens?

19. Certificate 1 gross is AED 160,000, retention 10%, cap AED 20,000. The retention is:

20. Certificate 2 gross is AED 170,000 with 16,000 already held and a cap of AED 20,000. The retention is:

21. A petty cash voucher needs a receipt photo.

22. A petty cash tax invoice shows AED 400 plus 5% VAT. What leaves the float and what is the cost on the item?

23. A cost pool of AED 12,000 with 100, 60 and 40 approved regular hours on A, B and bench. What moves to projects?

24. A timesheet entered by a foreman is approved by: